Menu

Premier Harvey

Premier Harvey offers expansive facilities designed for the demands of fabrication and heavy lift. It is a work-flow efficient yard that is well-equipped to handle even the most demanding project requirement.

Located on the Harvey Canal in New Orleans, the yard provides direct access to the Gulf of Mexico by boat and barge.

Services:

• Engineering
• Pressure Vessels
• Project Management
• Fabrication and Repair
• Production Facilities
• Production Modules
• Onshore & Offshore Construction
• Maintenance Crews
• Compressor Packages
• Sandblasting & Painting

Facility Specifications:

• ASME U Stamp & NBIC R Stamp
• 17 Workstations
• 11.5-Acre Area
• 1,450-Linear-Foot Bulkhead(Includes 300' x 250' Slip)
• 12-Foot Water Depth
• (2) 150-Ton Crane Capacity
• (1) 275-Ton Crane Capacity
• 22,400-Square-Foot Covered Shop Area
• Barge Capacity at Dock: Three 100' x 300'
• 100' x 200' Sandblast/Paint Area
• Load Outs
- Yard Crane to 100 Tons
- Contract Derrick Barge to 1,000 Tons
- Skid Load Out 2,500 Tons

 
© 2011 All Rights Reserved - Premier Industries, Inc - Turnkey Solutions. Global Reach.